TitleProduct

High Pressure Large Size Bandlock Quick Opening Closure

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Liaoning

  • Validity to:

    Long-term effective

  • Last update:

    2017-09-09 23:18

  • Browse the number:

    158

Send an inquiries

Company Profile

Shenyang Yongye Industry Co.,Ltd

By certification [File Integrity]

Contact: syyysy(Mr.)  

Email:

Telephone:

Phone:

Area: Liaoning

Address: Liaoning

Website: http://www.yongyeindustry.com/ http://syyysy.coossi.com/

Product details
Installation of Closure

          1Installation of Horizontal ClosureRight-handed Door

Put the closure axis horizontally. When face to the QOC lip, the drive wrench is at left, the tumble is at horizontal direction. Butt joint the barrel sub and vessel according to the weld standards, and make the inner diameter consistent.

2)        Installation of Vertical Closure

Put the closure axis perpendicularly to the horizontal on the barrel which is butted joint with vessel. When the operator face to the vessel, the upright of the closure is in the back, and the drive wrench is in the front. Butt joint the barrel sub and vessel according to the weld standards, and make the inner diameter consistent.

Disassemble of QOC Lid

When installation or maintenance needs to disassemble the QOC lip, please obey the following programs:

NoteThe QOC lip should be disassembled before welding the closure and the pressure vessel.


Control of Welding Deformation

1)Please make the weld line space well-distributed and consistent when the QOC and fit up with the barrel. The maximum and minimum space can’t be more than 0.5mm. The variable quantity of welding line counterparts should meet the GB150 standard.

2)The distribution of weld spots should be well-distributed and symmetric when weld the QOC and barrel.

3)When weld, adopt the symmetric method, and use low current, multi-layer welding, and control the energy of weld line to prevent from welding deformation.

 

When finish the weld of QOC and barrel, please take stress relief heat treatment to the weld line according to dock wall thickness, material, GB150 and other related standards. 

Shield Program of Coating

1)When coat, the marked area in the following figure can’t be coated.

2)Before coating, the lock ring, security screws, tightening mechanism and sealing should be removedThey needn’t to be coat because of the stainless steel material.

3)The pin, bearing and all the thread holes should be protect from the sand

Reinstallation of QOC Lid

If need re-install the quick opening closure lid, comply with the rules below:

        1)      Make sure the quick opening closure be supported or suspended (some quick opening closure with outsize have lifting lug) install pin, tight the bolts.

        2)      Install the quick opening closure lid, check and adjust the is in center.(refer 2.7- centering adjust of quick opening closure).

        3)  Ensure all the sealing surface are anti-corrosion protection ( refer sector

4-maintain)

4) Rolling out the lock ring to the lock position, install the insurance screw component.